Pre-Engineered Steel Structures
The major components of a PEB are manufactured off-site construction with strict adherence to the carefully engineered design and according to the client’s needs.
Pre-engineered buildings have 3 main components:
- Primary built up members: Columns: vertical members from the ground up. Rafters: horizontal members connecting the top of the columns.
- Secondary members: longitudinal members running along the length of the building, connecting to the main frame. Cold formed “Z” and “C” shaped purlins and girts.
- Cladding: the outside covering of the buildings.
The advantages of pre-engineered buildings (PEB) include:
- One source for the total building solution
- Guaranteed 6 – 8 weeks production time
- Lower cost due to efficient design and lighter structure
- Longer clear span options (without interior columns)
- Low maintenance requirements
- Quick turnkey construction
- Effectively zero construction waste
- Highly energy efficient and recyclable