DesignBuild Solution
The most effective and most popular method used to deliver construction projects is the design-build approach. This approach means that one entity, the design-builder, enters into a single contract with the owner to provide both design and construction services.
The benefits of sole-source responsibility for both design and construction include:
- Greater cost efficiencies with fewer change orders
- Earlier knowledge of total project costs
- Shared responsibility for the design, budget and schedule
- Quicker project delivery through superior collaboration

Marvinbuild dedicated team works with you from the beginning to end of your construction project.
This collaborative and vertically-integrated team works with you every step of the way to ensure the project stays within budget and on schedule. The team members, including architects, project managers, engineers, drafting technicians, project estimators, and construction management professionals, all utilize the same four-phase project delivery system process.
We developed the design-build process with our customer in mind, as it enables us to deliver projects that meet your scope, schedule, and budget. This alleviates stress, eliminates time loss, and ultimately reduces the overall project cost, as our design fees are nominal and included as part of the construction package.Our project delivery system process:
1. Concept Phase
Schematic Design
- Programming, initial code reviews, initial design ideas and arrangement of rooms and initial site layout
- Design Development
- Floor plans, elevations, renderings, room finishes and major material selection
- Budgeting
- Written scope of work, transparent cost estimates and align concept design with budget estimates
2. Design Phase
Geotechnical Investigation
- Soils borings and foundation recommendations
- Complete Construction Drawings and Specifications
- Certified architectural and structural drawings, certified civil plans, certified mechanical, electrical and plumbing drawings and written specifications
3. Build Phase
Sign Fixed-Cost Contracts
- Division of responsibilities, written scope of work with details, and clear and transparent costing
Construction Management
- Manage schedule, coordinate all trades, and maintain a safe jobsite.
Quality Control
- Testing, inspections, and documentation.
4. Completion Phase
Punch-list
- Owner and contractor walk-through with a written list of final closeout items.
Closeout Documents
- Organized operations and maintenance info, final lien waivers and closeout documentation.